Tara Hills Pedestrian Infrastructure

Project Information

Project No.:  0662-6R4211 
 
Project Description:  The project consists of installing 26 curb ramps in the Tara Hills residential area.  The curb ramps will be placed on Shamrock Drive, Dolan Way, and Flannery Road. Bulb-outs will be installed at the intersection of Dolan Way and Flannery Road.  Other project work includes drainage modifications, sign replacement, and thermoplastic striping and markings.

General Location: In the community of Tara Hills in between the Cities of Richmond and Pinole along Shamrock Drive, Dolan Way, and Flannery Road
Supervisory District: #1
Thomas Brothers Map Reference:  Page 569/B5-6, C5-6      
Contract Cost (Est.): $318,000      
Project Manager: Adelina Huerta          
Bid Due Date: TBD   
Funding Source: Gas Tax, Measure J 
Working Days: 20  
Construction Date: Summer 2018
 
Outreach Program: The bidder shall make a “Good Faith Effort”, and document this effort, to obtain sub-bid participation by MBE’s, WBE’s, OBE’s, SBE’s and LBE’s in accordance with the project special provisions to be eligible for award.  Bidders that have not attended a pre bid meeting in the last 12 months should attend the County pre bid meeting noted in the Notice to Contractors.  The pre bid meeting will include an overview of the Outreach Program requirements and staff will be available to answer your questions.